Agee Cabinet Doors & Refacing
  • Home
  • About
  • Gallery
  • Services
  • FAQs
  • Reviews
  • Owner
  • Tips
  • Contact

Pre-Installation To-Do List

5/25/2018

 
Things To-Do before your installation date
Please:
  1. If possible, have garage accessible and cover items you don't want dust on.
  2. Pre-plan your menu for the days the installer is there so you will not have to be in the kitchen.
  3. Clear countertops. If countertops are being replaced, remove items and tape off door openings in case of excessive dust.
  4. Be sure to remove the contents of your drawers and any china or stemware in the cabinets. If drawer boxes are being replaced, please empty the lower cabinets.
  5. Remove curtains or knickknacks from around cabinets and areas where work will be done.
  6. Remove pictures, clocks, etc. on adjoining walls.
  7. Push items back three inches on bottom shelves of upper and lower cabinets.
  8. Arrange for plumber and electrician, if needed. We are not licensed to install sinks or appliances.
  9. Be sure pets and children will not have access to the kitchen work area or garage.
  10. Please have payment available after job is complete.
Click to download a pdf file of this article

Comments are closed.

Agee Cabinet Doors & Refacing
918-622-6188
8708 E. 41st Street
Showroom Hours
Monday-Friday: 8:00am - 4:30pm
Saturday: 9:00am - 12:00pm
Terms & Conditions of Use
© 2020 Agee Cabinet Doors & Refacing
  • Home
  • About
  • Gallery
  • Services
  • FAQs
  • Reviews
  • Owner
  • Tips
  • Contact